System displays information like Water Division, District, County, Permit No UW, UW District, Name of Well, Date of Priority, Location, Section, Township, Range, Name of Claimant, Address, City, State, Zip from the instrument. Proof Inspector has to fill the following details:
Specify if the original appropriator is informed about the necessity of assignment and has the form been supplied.
Provide details.
Specify if any discrepancy is observed in the described location.
Provide details.
Specify if any other differences with the permit were observed.
Provide details.
Specify if the reservoir has been in continuous use since completion.
Provide details.
Specify if the reservoir has been in use for all the purposes applied for.
Explain how the uses are made.
If the reservoir has supply ditch give dimensions and where measured and permit number.
Specify if the proof is being submitted for the supply ditch at this time.
Provide details.
Specify if the reservoir is supplied from the source mentioned in permit.
Specify if the reservoir has an outlet pipe.
Enter size of the outlet pipe.
Specify if the reservoir has a vertical outflow pipe.
Enter size of the vertical outflow pipe.
Provide size and type of the outlet gate.
Enter length of the pit.
Specify if the pit is irregular.
Specify if you recommend approval.
If not, provide reasons.
Specify if the applicant signing proof on behalf of a corporation has given his title.
Enter title.
Specify if all applicants have signed or if the power of attorney has been attached.
Provide details.
Enter geographic coordinates.
Enter Comments.
Pick date of inspection.
Click Save.
NOTE: Click Cancel to exit without saving.
Click Generate Proof